Electricians Create in CertBox

Minor Electrical Installation Works — Multiple Works

A Multiple Works Minor Electrical Installation Certificate covers multiple small electrical works recorded on a single certificate. It is used when carrying out several related minor works items (e.g. replacing accessories, adding sockets across rooms) on a single visit.

BS 7671:2018+A2:2022Valid: One-off (for the batch of works)

No credit card required. Set up in 30 seconds.

Sample Multiple Minor Works certificate

Sample Minor Electrical Installation Works — Multiple Works certificate created with CertBox, showing the professional PDF layout with works schedule with descriptions, location and circuit reference per item, type of work (new/addition/alteration/replacement)

Sample Multiple Minor Works with fictional data. All personal details shown are fake.

What it covers

  • Works schedule with descriptions
  • Location and circuit reference per item
  • Type of work (new/addition/alteration/replacement)
  • Test results per work item
  • Overall assessment

Who needs a Multiple Minor Works?

Electricians
Maintenance electricians
Facilities contractors

Create your Multiple Minor Works with CertBox

1

Fill in the form

Pick Multiple Minor Works from the list, fill in the fields on your phone.

2

Compliance checks run

Built-in validation catches missing fields and out-of-range readings.

3

PDF generated instantly

Professional PDF ready to share via secure link or download.

Frequently asked questions about Multiple Minor Works

When should I use a multiple works certificate?
Use this when completing several small, related electrical works on a single visit or project. For example: replacing multiple light fittings, adding sockets in several rooms, or upgrading accessories throughout a property.
Does each work item need separate test results?
Yes. Each work item should have its own set of test results including continuity (R1+R2), insulation resistance, earth fault loop impedance, and polarity check. This ensures every piece of work is individually verified.

Ready to create your Multiple Minor Works?

Free plan available. Set up in 30 seconds, no card required.

No credit cardCancel anytimeSet up in 30 seconds

Create your Multiple Minor Works in minutes