CDM F10 Notification

An F10 Notification is the formal notification to the HSE that a construction project is taking place. It is required under the Construction (Design and Management) Regulations 2015 when the project will last longer than 30 working days and have more than 20 workers at any one time, or exceed 500 person-days.

Construction (Design and Management) Regulations 2015Valid: Duration of the project

What it covers

  • Project details and address
  • Client and principal contractor details
  • Principal designer details
  • Planned start date and duration
  • Estimated maximum workers on site
  • Notification submission tracking

Who needs a F10 Notification?

Clients (commercial projects)
Principal designers
HSE

Create your F10 Notification with CertBox

1

Fill in the form

Pick F10 Notification from the list, fill in the fields on your phone.

2

Compliance checks run

Built-in validation catches missing fields and out-of-range readings.

3

PDF generated instantly

Professional PDF ready to share via secure link or download.

Frequently asked questions about F10 Notification

Do I need an F10 for a house extension?
Only if the project exceeds the thresholds: more than 30 working days with more than 20 workers at any point, or more than 500 person-days total. Most domestic extensions don't reach these thresholds.
When must the F10 be submitted?
The F10 must be submitted to the HSE as soon as practicable before the construction phase begins. It should be submitted by the client (or their agent) and include details of the principal designer and principal contractor.

Ready to create your F10 Notification?

Free for individual tradesmen. Set up in 30 seconds, no card required.