Plumbers Create in CertBox

Scaffold Inspection Report (7-day)

A Scaffold Inspection Report records the results of a periodic inspection of an erected scaffold. Under the Work at Height Regulations 2005, scaffolds must be inspected before first use, every 7 days while in use, and after any event that could affect stability.

Work at Height Regulations 2005, Schedule 7Valid: 7 days (must be re-inspected)

What it covers

  • Scaffold condition assessment
  • Structural integrity check
  • Tie and bracing inspection
  • Platform and guardrail check
  • Access and loading assessment
  • Defect identification and actions required

Who needs a Scaffold Inspection?

Site managers
Principal contractors
HSE inspectors

Create your Scaffold Inspection with CertBox

1

Fill in the form

Pick Scaffold Inspection from the list, fill in the fields on your phone.

2

Compliance checks run

Built-in validation catches missing fields and out-of-range readings.

3

PDF generated instantly

Professional PDF ready to share via secure link or download.

Frequently asked questions about Scaffold Inspection

How often must scaffolds be inspected?
Before first use, at intervals not exceeding 7 days, and after any event likely to have affected stability (e.g. high winds, collision, modification). The inspection must be carried out by a competent person.

Ready to create your Scaffold Inspection?

Free for individual tradesmen. Set up in 30 seconds, no card required.